From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:49 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Nestor Martinez 

Last updated:  12/08/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Houston, TX  77075
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Nestor Martinez - Planner/Scheduler

Resume Value: u6c4udtcettudsds   

  

 

Nestor David Martinez                                                            

 

Cell 713-202-3123, Office 281-421-6590

                                                                                                                                                 8422 Saylynn Ln.

nessdm63@yahoo.com;                                                                                                     Houston TX.77075

 

Professional summary:

Professional executive construction supervisor proficient on project controls, planning & scheduling, production superintendent, quality assurance and quality control with 29 years of experience in the Oil & Gas industries, Refineries, Chemical Plants and Power Plants. Strong problem solving, excellent customer communication, friendly and team worker oriented to meet company goals.

­­­­­­­­­­­­­­­­­­­­­­­­­­­­

Education and Accreditations:

·     Autonomous University of Tamaulipas; MEXICO, (UAT) 2 Years completed out of 5 year course in Engineering.

·     Preparatory School Benito Juarez, Tampico, Tamaulipas; MEXICO, Introduction to Administration, Completed.

·     California University High School 6/25/2010, Completed.

 

Special Training and Skills:

·    Certify Oracle-Primavera P6.

·    Microsoft Office Outlook, Excel, MS Word, Power Point, Access data base, etc.

·    Auto Cad 2004 version.

·    Certify API 570 Inspector, (41297) Strong Knowledge of B31.3, B31.1, API 510, Sec. IX Welding and Brazing Qualification, and Sec V Nondestructive Examination.

·    Strong assembly of Work Test packages, field inspector and pre-commissioning.

·    SAP, MM (material management) production module, Create PO, WO and Purchasing

 

Work Experience:

2013 Present                 Kap Project Services          Chevron Philips Chemical. City Bayou Bay Town. TX

 

Planner & Scheduler

T/A, API 570, CUI (corrosion under insulation) Inspection Project,

Planning/Scheduling Field walk inspection, Isometrics Systems, build and

Execution work flow and strategy, complying with all health and safety environment

Procedures, estimate man hours and any other especial tools or equipment require for

Execution, create multiple projects in one in P6, in put activities, duration hours, P6 code

For future control of the project giving the availability of level, resources, create s-curves

By contractor, base line, plan and actuals and look-ahead reports for execution.

Coordinate and control project perform weekly updates and for cast resources ramp down

And ramp-up man power as need it. Strong problem solving.

 

 

 

·       2012-2013                                                   Starcon International.                                    ExxonMobil Chalmette LA.

 

Planner & Scheduler

Management, organization, T/A Planning/Scheduling, projects, planning and implementation, staffing of directs and in directs (250 days and nights), Create PO and different phases of cost tracking for the project   , customer Service, marketing, sales, quality control, public relations, Develop baseline progress schedule, Develop required layouts for baseline progress schedule, Develop baseline progress curves, Collect progress status from client, engineering, operation, and third party entities. Visit jobsite and evaluate physical progress, Update progress curves, Analyze progress schedule and curves as well as build recovery plan for projects. Post progress schedule and curves to the project drive, Communicate status to project team. Projects scope over 10 million, Alkylation Unit, FCC Unit, and Crude Unit.

 

 

·       2011-2012                                                   Starcon International.                             Holly Frontier Refinery Tulsa OK.

 

Planner & Scheduler

PIPING/MECHANICAL planning/Scheduling, building execution work test packages and follow up in the field, change orders, estimate direct labor MH, schedule and supervise sub-contractors, Create detail pipe work packages distributes to production for implementation and monitor progress, Assist in development of detailed build strategies as a pertains to pipe pre-outfitting, final pipe outfitting, system testing and trail in accordance with contract specification drawings. Assist in identification and sequencing of all outfitting activities in accordance with established build strategies. Work closely with production supervisory personnel to coordinate daily activities and flow of interim products and materials in a dynamic environment to ensure smooth and efficient construction in accordance with detail plans and schedule, thru all projects.

 

2011-2012                                 SMWS Planning.                      ExxonMobil, Torrance California

 

Planner & Scheduler

T/A, API 570,510,510 State permitted, PMI and Equipment Strategy Inspection,

Planning/Scheduling Field walk inspection and T/A Isometrics packages, build and

Execution work flow and strategy, complying with all health and safety environment

Procedures, estimate man hours and any other especial tools or equipment require for

Execution, create multiple projects in one in P6, in put activities, duration hours, P6 code

For future control of the project giving the availability of level, resources, create s-curves

By contractor, base line, plan and actuals and look-ahead reports for execution.

Coordinate and control project perform weekly updates and for cast resources ramp down

And ramp-up man power as need it. Strong problem solving.

 

 

 

 

 

·       2009-2010                                                   MEI, Inc.                                                 ExxonMobil, Torrance California

Planner & Scheduler

 

PIPING/MECHANICAL/QA/QC planning/Scheduling, building execution work test packages and follow up in the field, change orders, estimate direct labor MH, schedule and supervise sub-contractors, Create detail pipe work packages distributes to production for implementation and monitor progress, Assist in development of detailed build strategies as a pertains to pipe pre-outfitting, final pipe outfitting, system testing and trail in accordance with contract specification drawings. Assist in identification and sequencing of all outfitting activities in accordance with established build strategies. Work closely with production supervisory personnel to coordinate daily activities and flow of interim products and materials in a dynamic environment to ensure smooth and efficient construction in accordance with detail plans and schedule, thru all projects.

 

 

 

 

 

 

·       2002-2009                                                   Starcon International                                                          La Porte, TX.

Planner & Scheduler

Management, organization, T/A Planning/Scheduling, projects, planning and implementation, staffing, customer Service, marketing, sales, quality control, public relations, Develop baseline progress schedule, Develop required layouts for baseline progress schedule, Develop baseline progress curves, Collect progress status from client, engineering, operation, and third party entities. Visit jobsite and evaluate physical progress, Update progress curves, Analyze progress schedule and curves. Post progress schedule and curves to the project drive, Communicate status to project team. Projects scope over 400 million, Alkylation Unit, Crude Unit, Hydro Cracker Unit, Coker Unit, Fuel Gas Treating Unit, Demineralizer Unit, and Reactors. @ ExxonMobil, Chalmette LA, Valero, San Nicolas Aruba, BP Texas City TX, Valero Benicia California. Community involvement

 

 

·       2001-2002                                            JV Industrial @ NCRA Refinery                                       McPherson, Ks.

Piping General Supervisor

Execute T/A Unit 402, 404, 409, 423, HCC Unit, Cocker Unit, LNG, Modify PSV system upgrade @ the Stripper, Fuel Gas Drum and Reactors, demo and new pipe replacement, use carb plugs in flare system to perform closure welds, hydro test.   Work inspection turn around request. Demo death legs, and install new piping by API  570 Replace Block Valves, CV, PSV, FE’S,

 

 

 

 

 

 

·  1996-2000                       KBR & Halliburton Inc. @                                        Houston TX.

Pipe Supervisor /                Greens Bayou, Marine yard 

General Supervisor            Bateria Artesa Carmito plant                   Reforma, Chiapas, Mexico                                                 

 

Overseeing and supervising international and domestic projects. Supervising the upgrade on the LNG plant in Carmitos Plant in Reforma Chiapas, Mexico. Overseeing heavy construction related to the Oil and Gas industry. Performed pipe fabrication and installation on OIL rigs. Resolving issues with piping design modification and support with suggestions to complete the project.

 

·  1982-1995                             Worked on various projects                            All over the World    

Industrial Pipe Fitter-          In the US and Internationally

Fabricator                               for the following companies:

 

Austin Industries, Veco Construction, North Slope Alaska. United Domio Construction, Wyatt Field Services In the US Virgin Islands, Morganty North Of Africa Bethioua Algeria GL1 – Zonatrac, Renovation. KCI, Fluor, Working Paper Mills, Power Plants, Petrochem, Refinery, Coal  Power Plants, Co - gen Power plants, Food Processing Plants, Onshore and Offshore Oil and Gas Rigs.

 

 

Business Skills:

Project Planning: Feasibility, planning, scheduling, estimating, staffing, procurement, implementation, meeting deadlines, delivery, follow-up, Work Flow and Efficiency, Presentation and Instruction, Marketing, Sales, Client Relations

 

 

 

Personal Skills and Attributes:

·      Self-motivated, high work standards, able to take direction and perform job duties following strict guidelines in an accurate and timely manner

·      Goal oriented and project driven

·      Experienced in teamwork, the importance of adhering high work standards, accountability, problem solving and follow-up

·      Written and oral communications

·      Organized, detail and solution oriented, adaptable to change, tolerant, avid learner

 

 

 

 

 

 

 

 

References:

 

John Hart

Scheduler

Kap Project Services

Chevron Philips Chemical Company LLC.

Office – 281-421-6773

hartje@cpchem.com

 

 

Ozzie Gonzalez

Starcon Project Manager

281-409-1838

ogonzalez@starcon.org

 

Dennis Reed

Especial Emphasis Program

Second Line Supervisor

310-213-5820

dennis.r.reed@exxonmobil.com

 

Robert Corona

T/A Scheduler

Flint Hills Resources

Corpus Christi, TX

Cell - 310-663-8536 

Robert.Corona@exxonmobil.com

 

Sid Kornick

ExxonMobil T/A Manager

504-301-5546

Sidney.kornick@exxonmobil.com

 

Joel Jones

ExxonMobil T/A Lead Planner

225-772-7924

joel.l.jones@exxonmobil.com

 

 

 

 

 

                                                                                        

Page 1 of 4

 

Experience

BACK TO TOP

 

Job Title

Company

Experience

Planner/Scheduler

Kap Project Services

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Planner/Scheduler

 

Target Company:

Company Size:

Occupation:

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-TX-Houston